Various committed german municipalities have drawn up requirements profiles for a high quality sewer renovation to ensure a tendering in accordance with VOB rules and the quality of the contracting companies.

The most well-known requirements profile was prepared by the Hamburg Municipal Water Works and the Working Group of South German Municipalities, comprising the cities of Augsburg, Karlsruhe, Mainz, Mannheim, Munich, Nuremberg and Stuttgart.

The first Hamburg requirements profile was drawn up together with a quality assurance plan in 1992. Both papers are an integral part of the contract in every tendering procedure. In order to complete the documents the tender texts for linings were fixed in special standard specifications. These three documents form the basis for a safe tendering procedure.

Furthermore, a pre-qualification is carried out where the renovating company has to provide evidence of material characteristics, mechanical, chemical resistance and wearing properties and is commissioned to carry out a trial project.

If the pre-qualification is issued by the Hamburg Municipal Water Works, the contractor can take part in all public tendering procedures in future without having to submit new evidence.

The documents have been revised several times to date through analysing the experience gained in Hamburg.

The Working Group of South German Municipalities (ASK) drew up a requirements profile for liner sewer renovations in 2005 together with the Rohrleitungssanierungsverband e.V. (RSV). This essentially contains the demands of the Hamburg Quality Assurance Plan, though it uses a wider range of monitoring mechanisms. One main difference to the Hamburg Requirements Profile is that the product offered has to be approved by the DIBt (Deutsches Institut für Bautechnik, Berlin) before any order will be issued. There is no pre-qualification such as exists in Hamburg. However, the contracting company does have to prove an adequate number of building site samples.

The requirements profile of the Southern German Municipalities has already been adopted by a number of German municipalities and can be downloaded free of charge from the RSV e.V. web site at www.rsv-ev.de and the Stadtentwässerung Nürnberg at www.abwasser.nuernberg.de.

Saerbeck, November 2019

WE ARE GETTING READY FOR NEW CHALLENGES IN 2020

The year 2019 is slowly coming to an end – already today we would like to thank you for a trusting and successful cooperation in 2019! In order to start the year 2020 together with you successfully and well recovered, we would like to inform you about our upcoming inventory and the company holidays at our plant in Saerbeck:

Read more...


Saerbeck, October 2019

WE ARE NO-DIG AWARD WINNER 2019!

At the "International NO-DIG Conference Florence" in early October, our potable water liner, the SAERTEX-LINER® H2O, was honoured with the "New Technology Award" from the International Society for Trenchless Technology (ISTT).

Read more...


Saerbeck, June 2019

APP FOR THE PIPE SYMPOSIUM ONLINE!

Do you already know our new app for the 8th Saerbeck Pipe Symposium? Here you will find all information about the event in September in Münsterland. Whether programme, exhibitor, side programme or registration: Everything online and always up to date!

Read more...


Saerbeck, June 2019

LOOKING FOR SOMETHING NEW? THAT MEETS WELL!
CHCESZ SPRÓBOWAĆ? DOBRZE SIĘ SKŁADA!

For our headquarter in Saerbeck (Homeoffice in Poland possible) we are looking for a sales representative in Poland (m/f/d). Are you interested? We are looking forward to your application!

Check here.

Read more...


Saerbeck, April 2019

WELCOME TO SAERBECK

Don’t miss out on September 26 or 27, 2019, when we open the doors to the Saerbeck Pipe Symposium at our head office here in the Münster region! It will be the 8th symposium in the more than 20-year company history of SAERTEX multiCom®.

Read more...


Saerbeck, January 2019

JUST ONE YEAR AFTER THE MAJOR FIRE...

... we start the new year as if (almost) nothing had happened. 

Read more...


Saerbeck, December 2018

As for the future, your task is not to foresee it, but to enable it. (Antoine de Saint-Exupéry)

The year is coming to a close, and so we cast our eyes toward the promise of 2019. The big fi re at the end of January 2018 showed us that, with a partner like you at our side and a motivated team behind us, we can overcome even the greatest of challenges.

Read more...


Saerbeck, 10th October 2018

Inventory & company holidays in December (Plant Saerbeck)

Due to our annual inventory we would like you to take following dates into consideration during your planning. Our office team will be available to assist as usual.

Read more...


Saerbeck, 01st October 2018

8TH SAERBECK PIPE SYMPOSIUM: 26. & 27.09.2019

On these days we will open the doors to the 8th Saerbeck Pipe Symposium in Münsterland.

Of course you will again find exciting lectures, interesting exhibitors in the indoor and outdoor area, live demonstrations and a great evening programme.

Read more...


Saerbeck, 06th June 2018

"SCHOOL GRADE" 1.5 FOR THE SHAFT-LINER OF SAERTEX multiCom

Our long-standing customer Swietelsky-Faber scored "very good (1.5)" with its SF shaft liner in a retest of the ICT product test "shaft rehabilitation". 

At our booth at IFAT in Munich last week, IKT-Managing Director Roland W. Waniek presented the IKT product test seal to Jörg Brunecker, Managing Director of Swietelsky-Faber.

Read more...

Saerbeck, 19th October 2017

New production and warehouse facility for SAERTEX multiCom

The construction work began early October on a new warehouse and production facility for SAERTEX multiCom at the site in Saerbeck. The project involves the installation of additional new production systems to expand the capacity for GRP-liners at the facility, which covers a surface area of  4,500 m2. The field of house connection liners (HASE) is being expanded with new areas, especially for the packaging, the impregnation, and the storage of the new light-cured liner.