Arrival in the morning – same-day completion
Your will barely set eyes on the SAERTEX-LINER® between its arrival at the site and the completion of the rehabilitation works. The liner will be drawn into the old pipe immediately after a sliding foil has been put into place. The light-weight liner means that its tensile strength, due to the longitudinal reinforcement of the liner, is able to absorb any winching forces, thus avoiding the liner being torn off or over-expanded.
Installation of the SAERTEX-LINERS® is carried out using compressed air. If there is still some water in the pipe line or in existing depressions, this water will be displaced evenly. The result is that the installed SAERTEX-LINER® fits perfectly to the wall of the old pipe.