SAERTEX-Multicom SAERTEX-Multicom
 
Products Installation Quality Environment Industrial clients The company Partners News
 
Curing
Thightness
Expenditure of time
Documentation
Videos

Arrival in the morning – same-day completion


Your will barely set eyes on the SAERTEX-LINER® between its arrival at the site and the completion of the rehabilitation works. The liner will be drawn into the old pipe immediately after a sliding foil has been put into place. The light-weight liner means that its tensile strength, due to the longitudinal reinforcement of the liner, is able to absorb any winching forces, thus avoiding the liner being torn off or over-expanded.

Installation of the SAERTEX-LINERS® is carried out using compressed air. If there is still some water in the pipe line or in existing depressions, this water will be displaced evenly. The result is that the installed SAERTEX-LINER® fits perfectly to the wall of the old pipe.

 

play animation   UV animation   play animation   Steam animation   play animation   Time needed
    print print site SitemapSitemap ImprintImprint DownloadsDownloadslogin Login
 
Auf Ihrem System scheint kein FlashPlayer installiert zu sein oder es ist
ein Update des Players notwendig. Sie können den Player hier herunterladen:


Macromedia and Flash are trademarks of Macromedia, Inc.